Component A


-

-

Component B


-

-

Component C


-

-

Total Solar Generation (MWh)

: -
: -
: -

Total Carbon Footprint Reduced (Tons)

: -
: -
: -
Sr. No. Empanelled Agencies Name Name of Contact Person E-mail ID Phone City District Address
1 M/s Shakti Pump (India) Ltd Mr.Mahesh Hedaoo mahesh[DOT]hedaoo[AT]shaktipumps[DOT][DOT]com 7024212252 Pithampur Dhar Plot No. 401, 402 & 413, Industrial Area, Sector-3, Pithampur-454774
2 M/s Rotomag Motors and Controls Pvt. Ltd Mr.Raghav Agarwal raghav[AT]rotosol[DOT]solar
sansap_bhalla[AT]yahoo[DOT]co[DOT]in
9871077220 Vitthal Udyog Nagar Anad 2102/3 & 4,GIDC Estate, Vitthal Udyog Nagar Gujrat-388121
3 M/s Premier Energies Limited Mr.Raman Bhatia tenders[AT]premiersolar[DOT]co[DOT]in
raman[AT]premiersolar[DOT]co[DOT]in
8569000069 Secunderabad Secunderabad Survey No: 54/Part, Above G pulla Reddy sweet shop, Vikrampuri colony, Karkhana Main Road, Secunderabad - 500009 Telangana
4 M/s Rajasthan Electronics & Instruments Limited Mr.Sanjay Charan mukesh[DOT]mathur[AT]reil[DOT]co[DOT]in
jitendra[DOT]kumar[AT]reil[DOT]co[DOT]in
sanjay[DOT]charan[AT]reil[DOT]co[DOT]in
7727011729 Jaipur Jaipur 2, Kanakpura Industrial Area, Sirsi Road, Jaipur – 302012 ( Rajasthan)
5 M/s Tata Power Solar Systems Limited Mr.Aqeeq Akhtar arpit[DOT]srivastava[AT]tatapower[DOT]com
aqeeq[DOT]akhtar[AT]tatapower[DOT]com
8127595395 Noida Noida B-12-13, 3rd Floor, Shatabdi Bhawan, Sector-04, Noida- 201301
6 M/s CRI Pumps Pvt. Ltd. Rahul Mahalwar rahul[DOT]ajay[AT]cripumps[DOT]com 9810995662 Coimbatore Coimbatore 7/46-1, Keeranatham road, sarvanampatti, Coimbatore, Tamilnadu,

As per tenders by M/s EESL and MNRE’s Allotment, the eligible Empanelled Agencies (Vendors) for Solar Pump, under different categories are as under:

Sr. No. Tender Name of Empanelled Agency for Solar pump Eligible for pump category
1 Up to 7.5 HP M/s Shakti Pump (India) Ltd Submersible & Surface Pumps 7.5 HP (AC)
2 M/s Rotomag Motors and Controls Pvt. Ltd Surface Pumps 3 & 5 HP (AC)
3 Premier Energies Limited Submersible Pumps 3,5 & 7.5 HP (AC)
4 Tata Power Solar Systems Limited Submersible & Surface Pumps (Water Filled Motors) 3 & 5 HP (AC)
5 M/s CRI Pumps Pvt. Ltd. Submersible & Surface Pumps 3 & 5 HP
6 10 HP Rajasthan Electronics & Instruments Limited Submersible Pumps 10 HP (AC)
7 Tata Power Solar Systems Limited Submersible & Surface Pumps (Water Filled Motors) 10 HP (AC)
Track your application by entering your Application No. and Consumer Mobile No.

List of Nodal Officer of DISTRICTs for PM-KUSUM Component-B

Sr.No. District Name Designation Place of posting Contact Number E-mail
1 BAGALKOTE
2 BENGALURU URBAN
3 BENGALURU RURAL
4 BELAGAVI
5 BALLARI
6 BIDAR
7 VIJAYAPURA
8 CHAMARAJANAGARA
9 CHIKKAMAGALURU
10 CHITRADURGA
11 DAKSHINA KANNADA
12 DAVANGERE
13 DHARWAD
14 GADAG
15 KALABURAGI
16 HASSAN
17 HAVERI
18 KODAGU
19 KOLAR
20 KOPPAL
21 MANDYA
22 MYSURU
23 RAICHUR
24 SHIVAMOGGA
25 TUMAKURU
26 UDUPI
27 UTTARA KANNADA
28 CHIKKABALLAPURA
29 RAMANAGARA
30 YADGIR

Frequently asked questions

PM-KUSUM Scheme supports three different kind of installations, known as three components of the Scheme as given below:

  1. Component-A: Setting up of decentralized ground/ stilt mounted grid connected solar or other renewable energy based power plants up to 2 MW capacity
  2. Component-B: Installation of stand-alone solar agriculture pumps of capacity up to 7.5 HP
  3. Component-C: Solarisation of existing grid connected agriculture pumps of capacity up to 7.5 HP

Under this component, solar or other renewable energy based power plants of capacity 500 kW to 2 MW can be installed on barren or uncultivable agriculture land mainly. Agriculture land is also permitted under this scheme provided that solar plants are installed in slit fashion (i.e. raised structure for installation of solar panels) and with adequate spacing between panel rows for ensuring that farming activity is not affected.

Individual farmers/ group of farmers/ cooperatives/panchayats/ Farmer Producer Organisations (FPO)/Water User associations (WUA). Land on which the project is proposed to be installed should be within 5 km from the nearest electricity sub-station.

Power generated will be purchased by the local electricity distribution companies (Discoms)

Yes, farmers can either install renewable power project on their land or lease the land on rent to a developer at mutually agreed terms between the parties.

The renewable power generated will be purchased by DISCOMs at a pre-fixed levelised tariff. The duration of PPA will be 25 years from Commercial Operation Date (COD) of the project. Procurement based incentive (PBI) of 40 paisa per unit of electricity generated or Rs. 6.6 lakh per MW per annum, whichever is lower, will be provided to DISCOM for buying electricity generated for five years.

Under this Component, farmers can replace their existing diesel poweredagriculture pumps with standalone solar pumpsof capacity up to 7.5 HP in off-grid areas. Pumps of capacity higher than 7.5 HP may be allowed, however, the central subsidy will be limited to the subsidy applicable for pump of 7.5 HP.

Individual farmers, Water User Associations and community/cluster based irrigation system will be covered under this component.

For all states except for North-eastern States, Hill States/UTs and Island UTs, subsidy of 30%, each by Central and State Governments will be provided, and the remaining 40% will be invested by the farmer for installation of solar pump. Subsidy in percentage mentioned above is applicable on benchmark cost or tender cost, whichever is lower. For North-eastern States, Himachal Pradesh, Uttarakhand, Jammu and Kashmir/Ladakh and Island UTs, subsidy of 50% will be provided by Central Government and at least 30% will be provided by the State Government for installation of solar pump. Farmer will have to invest balance 20%.

Under this Component, farmers can solarize their existing grid connected agriculture pumps of capacity up to 7.5 HP. Solar PV capacity up to two times of pump capacity in kW is allowed under the scheme.However, States may choose to allow lower solar PV capacity, which in no case will be less than pump capacity in HP. The farmer will be able to use the generated solar power to meet the irrigation needs and the excess solar power will be sold to DISCOMs.

Individual farmers, water user associations and community/cluster based irrigation system will also be covered under this component.

For all states except for North-eastern States, Hill States/UTs and Island UTs, subsidy of 30%, each by Central and State Governments will be provided, and the remaining 40% will be invested by the farmer for solarization of existing pumps. Subsidy in percentage mentioned above is applicable on benchmark cost or tender cost, whichever is lower. For North-eastern States, Himachal Pradesh, Uttarakhand, Jammu and Kashmir/Ladakh and Island UTs, subsidy of 50% will be provided by Central Government and at least 30% will be provided by the State Government for solarization of existing pumps. Farmer will have to invest balance 20%.

Individual farmers/ group of farmers/ cooperatives/panchayats/ Farmer Producer Organisations (FPO)/Water User associations (WUA). Land on which the project is proposed to be installed should be within 5 km from the nearest electricity sub-station.

For all states except for North-eastern States, Hill States/UTs and Island UTs, subsidy of 30%, each by Central and State Governments will be provided, and the remaining 40% will be invested by the farmer for solarization of existing pumps. Subsidy in percentage mentioned above is applicable on benchmark cost or tender cost, whichever is lower. For North-eastern States, Himachal Pradesh, Uttarakhand, Jammu and Kashmir/Ladakh and Island UTs, subsidy of 50% will be provided by Central Government and at least 30% will be provided by the State Government for solarization of existing pumps. Farmer will have to invest balance 20%.

For more information, please visit https://mnre.gov.in/solar/schemes/ or call at toll free number 1800-180-3333.